[Get Solution] Sales and Marketing System
* Paper must me in APA format w/ Abstract and 3-5 keywords * This is the 2nd part for of a previous assignment. * I have attached the 1st written paper for this assignment (823351- table in this paper is being corrected). * I have also attached a separate sample paper for guidance as well (docx2). Paper cannot copy this content, must be original. * I have attached 1 zip file that contains the majority of information on RMO (CH C file contains the data on the company that is needed). There are images that are in the sample paper that can be found in this zip file to be used as well. Project Report 2 (Steps 5?8) focuses on some of the tasks associated with developing and implementing the plan proposed in Project Report 1. Step 5: Gather and organize data This step should discuss how data will be collected, organized, manipulated, and presented. There also should be some discussion of how the user will interface with the system and how data and system security and integrity will be assured. Data collection is very important. Detail out the tools and data collection points that are to be used. Step 6: Design system and documentation This step should indicate the major elements and decision points of the proposed system and should identify the types of system and user documentation that will be produced, ideally with examples. Step 7: Develop an implementation approach This step should detail a plan for implementing the system including schedules, resources, data conversion techniques, and a fall-back or contingency approach. (Note: Discuss what to do if the initial implementation fails.) Step 8: Develop a training approach and schedule for end users This section should detail a plan and schedule for training and supporting users in the use of the new system. This is extremely important. Detail out the length of time training and support is to take place.